Chapter 9 Thu: Wrapping Up
9.1 A Facility Overview and Operational Considerations
- Accelerator systems and their integration
- Controls and operations
- Time lines and Program Management
- Other operational issues
9.2 – Spare Lecture –
Possible Topic(s) (time permiting) –
- Future Circular Collider (FCC) overview
- Muon g-2 and EDM storage ring designs
- Emittance reduction techniques
- Emittance exchange systems
- …
9.3 Outlook for the Field
- Final wrap-up
- Current status of the field of accelerators and beams