Chapter 9 Thu: Wrapping Up

9.1 A Facility Overview and Operational Considerations

slides

  • Accelerator systems and their integration
  • Controls and operations
  • Time lines and Program Management
  • Other operational issues

9.2 – Spare Lecture –

slides

Possible Topic(s) (time permiting) –

  • Future Circular Collider (FCC) overview
  • Muon g-2 and EDM storage ring designs
  • Emittance reduction techniques
  • Emittance exchange systems

9.3 Outlook for the Field

slides

  • Final wrap-up
  • Current status of the field of accelerators and beams

9.4 REVIEW

slides

  • Preparation for Final Examination
  • Q & A